3.8.5 Preconstruction Conference
This paragraph is included in your selections.
When deemed necessary by the Sedimentation and Erosion Control Officer, or designee, a preconstruction conference may be required.
When deemed necessary by the Sedimentation and Erosion Control Officer, or designee, a preconstruction conference may be required.